0
Wish List 0
Product Compare 0
0item(s) - $0.00 

Decorative Star Project Plan: Full Woodworking Template for Large LED Christmas Decor

$12.00
  • In Stock
  • Manufacturer:  ProjectOK
  • Product Code:  other.plan.009

PDF file. BUY AND DOWNLOAD.


$12.00
Large, decorative wooden star perfect for festive holiday displays, designed with an option for LED lighting.

This item is a digital download of detailed DIY construction plans, and does not include any construction materials.

Experience Level: Beginner

External dimensions (approx.)
Height – The finished star height is completely customizable. Your plan includes all the necessary calculations and formulas to scale the design to any size you wish!

This is an instruction that can be downloaded for self-production and installation of a STAR.
▪ The instruction consists of 21 pages.
▪ The construction process is described in stages, each staged using text, 2D and 3D models. The illustrations are supplemented with letter codes and colors for ease of understanding.
▪ The plans also include a list of materials, purchases with the amount of equipment and wood you need to purchase.
▪ The choice of material is entirely up to you, but in our project you will find links to purchase.

Pdf files have been prepared for use in both metric and imperial measurement systems for users who will be shopping in different regions. After purchase, they will be sent to you automatically.

I can answer your construction questions if they arise. Just write me.

▪ Check out my DIY projects and see the quality of the designs for yourself. I'm confident they'll exceed your expectations! Link here - https://www.projectok.shop/about-diy-plans

▪ Plans are copyrighted by "Projectok.shop" and are for personal use only. No commercial distribution is allowed. To use our plans for commercial purposes please contact us!
Rating: 5 out of 5 stars
5
100%
4
0%
3
0%
2
0%
1
0%
M

As a beginner woodworker, I was hesitant, but this plan was fantastic! The instructions were incredibly clear, and the full-size template made cutting the angles easy. The star turned out perfect, and the LED channels are genius. A truly professional digital download. Highly recommend projectok's plans

Reply
A

The purchase experience was seamless. Instant download delivered right to my inbox. projectok clearly puts a lot of effort into their plans—the diagrams and cutting list are super professional. I finished the star in one weekend, and it's already a family favorite.

Reply
W

This is exactly what I needed for my holiday decor! The plan's detail on integrating the LED lights was spot on. My finished star is huge and looks stunning on our front porch. Worth every penny. Quick download, excellent file quality.

Reply
M

This star is the absolute centerpiece of our Christmas display now! The plan produces a beautiful, high-impact decoration. It's solid, well-designed, and the LED feature gives it a beautiful, warm glow. If you want impressive DIY holiday decor, buy this plan!

Reply
D

Top-notch woodworking plan. Everything was accurate, the material list was comprehensive, and the suggested dimensions worked perfectly for creating a massive decorative piece. I saved so much time not having to design it myself. Great value for a digital product!

Reply
Recently Viewed